high-tech enterprises

Intensive cultivation industry for 18 years

Consultation hotline:

139-2594-2134

0757-22905768

English
CNC lathe manufacturer
Your current location : Home >> News >> Technical problems

ContactContact

Foshan Jinlaoda Automation Equipment Co., Ltd.

Contact: Mr. Luo 139-2594-2134

Special line: 0757-22905223 / 22905768

After-sales Tel: 0757-22905216 / 22905768

Operator: 0757-22905226

Fax: 0757-22905218 / 22905226

Email: lao740202@163.com

Web site: en.sdld168.com

Factory address: No. 103, Block 3, Phase 9, Fulai International Industrial City, Ronggui Tian Fulai, Shunde District, Foshan City (next to Ronggui Light Rail Station)

How is the daily maintenance of the engraving machine?

2021-01-14 11:32:43
Times

Daily maintenance of engraving machine. 


The continuous running time is less than 10 hours a day to ensure the cleanliness of the cooling water and the normal operation of the pump, never make the water spindle motor lack of water, and change the cooling water regularly to prevent the water temperature from being too high. 

If the working environment temperature is too low in winter, the water in the water tank can be replaced with antifreeze. 


Every time the machine is in use, pay attention to cleaning, be sure to clean up the dust on the platform and transmission system, and lubricate and lubricate the transmission system (X, Y, Z three axes) regularly (every week). 

(note: X, Y, Z triaxial polished rods are maintained with oil; high-speed butter is added to the screw part; if the working environment temperature is too low in winter, the PRTT ball screw and smooth rod (square or circular guideway) should be washed and cleaned with gasoline first, and then add oil, otherwise it will cause excessive resistance in the transmission part of the machine and lead to machine dislocation. 

)


精雕雕刻机

When carrying out maintenance inspection of electrical appliances, be sure to cut off the power supply until there is no display on the monitor and the power indicator of the main circuit is off. 


After using the engraving machine for about three months, the fasteners should be checked, and the connecting screws on both sides of the gantry, the fastening screws of the screw nuts and the fastening screws of the motors on both sides should be fastened.

Tags

0

Recently Viewed:

About
- Company profile
- Qualification and honor
- Production workshop
Product
- Double spindle CNC lathe
- Turning-milling compound
- Standard CNC lathe
- Automatic feeding CNC lathe
- Truss manipulator and joint robot
News
- Company news
- Industry information
- Technical problems
Contact

National Enquiry Hotline:

Mr. Luo 139-2594-2134

Special (Tel): 0757-22905223 / 22905768

After-sales (Tel): 0757-22905216 / 22905768

Switchboard (Tel): 0757-22905226

Address: No. 103, Block 3, Phase 9, International Industrial City, Rong

数控车床厂家-双主轴数控车床-双主轴双刀塔数控车床

Follow us

数控车床厂家-双主轴数控车床-双主轴双刀塔数控车床

Mobile